Skip to content
Midstream storage and pipeline infrastructure
Glossary

Nigerian Energy Terms, Explained

Plain-English definitions of the terms used across Nigerian oil, gas, LPG and infrastructure projects.

Products

LPG
Liquefied Petroleum Gas, a mixture of propane and butane stored as a liquid under pressure. It is used for cooking, heating, industrial feedstock and power generation.
Cylinder
A pressure vessel used to store and transport LPG in small quantities, typically 3kg to 50kg sizes for domestic and commercial use.

Value chain

Upstream
The exploration and production stage of the oil and gas value chain, covering seismic survey, drilling, completion, workover and production.
Midstream
The transport, storage and processing stage between upstream production and downstream sales, including gathering, pipelines, terminals and treatment facilities.
Downstream
The refining, distribution and retail stage that turns crude oil and gas into usable products such as petrol, diesel, kerosene and LPG.

Delivery

EPCI
Engineering, Procurement, Construction and Installation. A delivery model where one contractor is accountable for all four phases of a project.

Infrastructure

Terminal
A facility where products are received, stored and loaded for onward distribution. For LPG, a terminal combines bulk storage tanks with loading and dispatch capability.
Dredging
The removal of sediment from waterways to maintain navigable depth, commonly required to create or maintain shipping channels and berths.

Upstream

Wellhead
The surface assembly that controls and supports a producing well, including the wellhead, casing head and Christmas tree.
Workover
Intervention on an existing well to restore, improve or extend its production rate, including logging, stimulation and completion changes.

Environment

Gas flaring
The burning of associated gas produced with crude oil. Routine flaring wastes a fuel input and releases CO2, which is why Nigeria has set targets to end it.

Policy

Local content
Nigeria's policy requiring that Nigerian engineering, labour and services are used wherever reasonably available on projects in the country.

Fueling Growth. Powering Nigeria.

Term you did not find, or need explained?